EDIWAN, E.; MULIADI, M.; MAHALLA, M.; NAZARUDDIN, N.; MULKAN, A. The Reconfiguration of Network at 20 kV Distribution System Nagan Raya Substation with the Addition of the Krueng Isep Hydroelectric Power Plant. Jurnal Nasional Teknik Elektro, [S. l.], v. 10, n. 2, 2021. DOI: 10.25077/jnte.v10n2.888.2021. Disponível em: http://jnte.ft.unand.ac.id/index.php/jnte/article/view/888. Acesso em: 2 may. 2024.