Ediwan, E., M. Muliadi, M. Mahalla, N. Nazaruddin, and A. Mulkan. “The Reconfiguration of Network at 20 KV Distribution System Nagan Raya Substation With the Addition of the Krueng Isep Hydroelectric Power Plant”. Jurnal Nasional Teknik Elektro, vol. 10, no. 2, July 2021, doi:10.25077/jnte.v10n2.888.2021.