1.
Ediwan E, Muliadi M, Mahalla M, Nazaruddin N, Mulkan A. The Reconfiguration of Network at 20 kV Distribution System Nagan Raya Substation with the Addition of the Krueng Isep Hydroelectric Power Plant. JNTE [Internet]. 2021 Jul. 1 [cited 2024 May 2];10(2). Available from: http://jnte.ft.unand.ac.id/index.php/jnte/article/view/888